
OIL Casing for Poland Client
July 14, 2021
K55 BTC R3 Casing for Egypt Client
July 14, 2021Oil casing is mainly used to support the well wall during drilling and after completion, so as to ensure the normal operation of the drilling process and the whole well after completion, and it is the lifeline to maintain the operation of the oil well.Due to different geological conditions, complex downhole stress state, tensile, compression, bending and torsional stresses on the pipe body, so the quality of oil casing itself is higher.The casing itself is also required to be corrosion resistant in corrosive environments.In complex geological conditions, casing is also required to have anti-crush performance.Casing can be divided into: conduit, surface casing, technical casing and reservoir casing.
Countermeasure of oil casing anticorrosion
- First do a good job of water quality standards, strict water quality testing and management.Clean and separate injection should be carried out to strengthen the cleaning of the main water pipeline, so that the water quality in the station and at the bottom of the well can reach the standard and reduce the introduction of corrosion sources into the annular space.
- For newly put into production of water injection Wells, annular protective fluid mainly used for sterilization should be added, and a system should be formed to add it regularly;
- In view of the accelerated effect of mechanical abrasion on oil casing corrosion, it is recommended to add a rubber ring to the tubing coupling or a centralizer to the severely inclined part of the well to avoid scratching the casing and one side of the casing during the operation and water injection process;
- In view of the serious corrosion of bacteria under scale and the slow growth and killing of SRB at high temperature, high-temperature water or steam at 100 degrees Celsius can be injected into the annulus regularly to kill SRB under scale;
- Cathodic protection and coated casing are not recommended to be popularized until the corrosion in the casing of water injection well is effectively controlled.